Definition
Production time is the time it takes to manufacture an order once it is released to the factory. For packaging, it usually starts after proof approval and covers material preparation, printing, finishing, cutting, gluing, packing and any internal quality checks, ending when the goods are ready to ship.
It is one part of the total lead time, which also includes quoting, proofing and shipping. Production time depends on the number of process steps, special finishes, hand assembly, material availability and the plant’s schedule, so suppliers usually quote it as a range of business days.
Best used for
Planning around the manufacturing window alone, separate from approval and transit.
Examples
Factors that lengthen production time:
- Multiple finishes such as foil and embossing.
- Rigid boxes with hand wrapping.
- Special board or film to source.
- Large quantities on one press.
- Inserts and kitting steps.
Peak seasons can extend schedules across the whole industry.
Purpose
Knowing the manufacturing window helps buyers plan realistically. Separating it out helps them:
- Pinpoint where time goes in an order.
- Compare suppliers on manufacturing speed.
- Choose simpler specs when time is short.
- Coordinate freight with the ship date.
Check the release conditions on the order. Missing artwork, materials or a required deposit can delay the scheduled start.