Definition
Sample cost is the charge for producing packaging samples before a full order. It covers the material, setup and labor of making a small number of pieces, and sometimes shipping them to the buyer.
The cost depends on the sample type. A plain structural sample cut on a digital table is quick and inexpensive, while a fully printed and finished pre-production sample can need plates, a press run and hand finishing. Some suppliers credit the sample cost against the first production order; whether they do is a commercial term set by each supplier.
Best used for
Budgeting the approval stage of a new design, before committing to a full production run.
Examples
Common sample types and what drives their cost:
- Plain structural samples for fit testing.
- Digitally printed samples for color and layout.
- Pre-production samples on the final materials.
- Stock box samples from a catalog range.
- Insert samples cut around the product.
Courier shipping is often charged separately from the sample itself.
Purpose
Paying for a sample is usually cheaper than fixing a full run. Samples let buyers:
- Check fit with the real product.
- See color and finish before approval.
- Show stakeholders a physical piece.
- Catch structural problems early.
A sample made by a different method than production may not match the final color or finish exactly.